Skip to main content
Redevelopment
Back

Ma Tau Wai Road/ Lok Shan Road Development Project (KC-020)

Location
324 – 354 Ma Tau Wai Road (even nos.)
Area
About 2,122 sq.m. (subject to site survey)
Affected buildings
Buildings at 324 – 354 Ma Tau Wai Road (even nos.)
Affected population
About 380 persons
Affected property interests
About 110 interests
Affected households
About 180 households
Ma Tau Wai Road/ Lok Shan Road Development Project  (KC-020)
Ma Tau Wai Road/ Lok Shan Road Development Project (KC-020)
Ma Tau Wai Road/ Lok Shan Road Development Project  (KC-020)
Ma Tau Wai Road/ Lok Shan Road Development Project (KC-020)

Project Development Information


Total GFA About 14,190 sq.m.
Residential GFA About 11,830 sq.m.
Non-Domestic GFA About 2,360 sq.m.

Project Status


The Government Gazette for the commencement of the Development Project (“the Project”) was first published on 9 August 2024 and a freezing survey was conducted within the Project on the same day. A description of the general nature and effects of the project and a plan delineating the boundaries of the project was made available from 9 August 2024 for 2 months (to 9 October 2024) for public inspection and submitting objections.

The Stage 1 social impact assessment report was made available for public information from 9 August 2024 to 9 October 2024. The Stage 2 social impact assessment report will be available for public information from 25 September 2024 to 9 October 2024. Both reports and project information can be viewed at URA’s headquarters and URA’s website at (http://www.ura.org.hk) and other venues specified in the Government Gazette.

The URA will accord to prevailing policies to commence acquisition and compensation to the affected persons upon SDEV’s authorization of the Project and all appeals (if any) have been dismissed.

Project Programme


Project commenced in August 2024.

Target completion by 2033/34.

Proposed Redevelopment


Under a “planning-led” and “district-based” urban renewal approach, the Project aims to improve the area through redevelopment. The Project would create synergy with the adjoining URA redevelopment to enhance the overall accessibility and connectivity of the area and at the same time improving the overall built environment to achieve greater planning gains to the community as a whole.

The key planning objectives and proposals of the Project include:

  1. Adopting holistic site planning and urban design with the adjoining URA’s Kau Pui Lung Road / Chi Kiang Street Development Scheme (CBS-2:KC Scheme) to create a cohesive built environment, with proposed shared-use of a vehicular run in/out to maintain street vibrancy along Ma Tau Wai Road;
  2. Enhance linkage between the east and west of Ma Tau Wai Road through the existing pedestrian-crossing facilities and CBS-2:KC Scheme, enhancing spatial connectivity at-grade;
  3. Subject to further technical feasibility study, the Project will explore to further extend the proposed underground shopping street in CBS-2:KC Scheme to the Project and the potential connection to the nearby To Kwa Wan MTR station exit, to enhance the overall accessibility and connectivity of the area; and
  4. Provide about 11,830 square metres of domestic gross floor area, 2,360 square metres of commercial/ retail facilities, with ancillary carparking facilities.
Back